Top Plate Replacement Procedure:
1. Remove the M8 bolts, 6 off, to remove the old Top Plate
2. Install the Top Plate for Weak Link, BC2576, 8 off M6 bolts, torque to
12 Nm
Weak Link Replacement Procedure:
1. Put receptacle in closed position.
2. Remove the M5 bolts, 6 off, to remove the broken weak link ring .
3. Inspect receptacle for damages.
4. Install the new weak link ring, 6 off M5 bolts, torque to 8 Nm.
5. Verify correct function by performing function tests and inspection as
described in Operation and Maintenance Manual Ø55mm Valve Stab,
doc. No. 600112-TD-0003,