Purpose built lifting beam assembly for handling and deployment of
Subsea Docking Station Modules, SDM, and Subsea Docking Bases, SDB.
Designed as a yoke with a centralized lifting point and two padeyes
below for connecting soft slings to 12,5T MultiDogs for quick
connection/disconnection by ROV.
Total lift capacity: 25t WLL